Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/smvx2t91g3pi/public_html/wp-includes/functions.php on line 6114
Dry Utilities Archives - United Construction Services LLC (UCS)

Archives

Project Category: Dry Utilities

Lorem Ipsum is simply dummy text

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged.

DC Plug Feeder 14008

March 6, 2024

Project 4 Duration: June 2023- Dec 2024Award: $3.9M Scope: Work under this Contract consists of the civil construction for PEPCO feeder 14008 of the DC Power Line Undergrounding (DC PLUG) Program, located in Ward 5 and bound by Montana Avenue NE, W Street NE, Brentwood Road NE, and 14th Street NE as shown on the… Continue reading DC Plug Feeder 14008

DC Plug Feeder 368

March 6, 2024

Project 3 Duration: April 2022- Dec 2022Award: $3.9M Scope: This underground transmission project included One (1) 6’x18 Switch pre-cast manholes, Seven (7) 6’x12’ Line manhole, Seven (7) 48”x72” Transformer Enclosures, and Three (3) 3.5’x3.5’ Tapholes installed in the Southeast corridor of DC and Maryland line.The work involved more than 2,000 cubic yards of soil excavated,… Continue reading DC Plug Feeder 368

ST. Elizabeth’s East Campus Infrastructure -Pecan St. SE

March 6, 2024

Project 2 Duration: Feb 2021- Mar 2022Award: $3.8M Scope: Installation of two (2) 6’x18 Switch pre-cast manholes, one (1) 6’x14’ Sidewalk Transformer Vault, Five (5) 6’x14” Roadway manholes, Five (5) 6’x12’ Roadway manholes and (6) 3.5’x3.5’ Tapholes installed in the Southeast corridor of DC. The work involved more than 10,000 cubic yards of soil excavated,… Continue reading ST. Elizabeth’s East Campus Infrastructure -Pecan St. SE

ST. Elizabeth’s East Campus Infrastructure -13th SE

March 6, 2024

Project 1 Award: $2.6M Scope This underground transmission project has one (1) 6’x18 Switch pre-cast manholes, one (1) 6’x14’ Sidewalk Transformer Vault, Five (5) 6’x14” Roadway manholes, Five (5) 6’x12’ Roadway manholes and (6) 3.5’x3.5’ tapholes installed in the Southeast corridor of DC. The work involved more than 10,000 cubic yards of soil excavated, over… Continue reading ST. Elizabeth’s East Campus Infrastructure -13th SE