DC Plug Feeder 14008
March 6, 2024
Project 4 Duration: June 2023- Dec 2024Award: $3.9M Scope: Work under this Contract consists of the civil construction for PEPCO feeder 14008 of the DC Power Line Undergrounding (DC PLUG) Program, located in Ward 5 and bound by Montana Avenue NE, W Street NE, Brentwood Road NE, and 14th Street NE as shown on the… Continue reading DC Plug Feeder 14008
DC Plug Feeder 368
March 6, 2024
Project 3 Duration: April 2022- Dec 2022Award: $3.9M Scope: This underground transmission project included One (1) 6’x18 Switch pre-cast manholes, Seven (7) 6’x12’ Line manhole, Seven (7) 48”x72” Transformer Enclosures, and Three (3) 3.5’x3.5’ Tapholes installed in the Southeast corridor of DC and Maryland line.The work involved more than 2,000 cubic yards of soil excavated,… Continue reading DC Plug Feeder 368
ST. Elizabeth’s East Campus Infrastructure -Pecan St. SE
March 6, 2024
Project 2 Duration: Feb 2021- Mar 2022Award: $3.8M Scope: Installation of two (2) 6’x18 Switch pre-cast manholes, one (1) 6’x14’ Sidewalk Transformer Vault, Five (5) 6’x14” Roadway manholes, Five (5) 6’x12’ Roadway manholes and (6) 3.5’x3.5’ Tapholes installed in the Southeast corridor of DC. The work involved more than 10,000 cubic yards of soil excavated,… Continue reading ST. Elizabeth’s East Campus Infrastructure -Pecan St. SE
ST. Elizabeth’s East Campus Infrastructure -13th SE
March 6, 2024
Project 1 Award: $2.6M Scope This underground transmission project has one (1) 6’x18 Switch pre-cast manholes, one (1) 6’x14’ Sidewalk Transformer Vault, Five (5) 6’x14” Roadway manholes, Five (5) 6’x12’ Roadway manholes and (6) 3.5’x3.5’ tapholes installed in the Southeast corridor of DC. The work involved more than 10,000 cubic yards of soil excavated, over… Continue reading ST. Elizabeth’s East Campus Infrastructure -13th SE