Duration: June 2023- Dec 2024
Award: $3.9M
Work under this Contract consists of the civil construction for PEPCO feeder 14008 of the DC Power Line Undergrounding (DC PLUG) Program, located in Ward 5 and bound by Montana Avenue NE, W Street NE, Brentwood Road NE, and 14th Street NE as shown on the plans and as directed by the Engineer. The scope of work includes, but is not limited to, the following major improvements: a. The removal and disposal of existing roadway pavement, curb, gutter, and sidewalks to the extents shown on plans or as necessary for access to trench excavation. b. The installation of PEPCO supplied materials such as PVC and fiberglass conduits, precast manholes, precast tapholes, precast transformer enclosures, and other related items and components. c. The furnishing and installation of pea gravel concrete for duct bank encasement. d. The furnishing and installation of thermal fill for duct bank encasement at transmission feeder crossings. e. The furnishing and installation of concrete and reinforcing steel for cast-in-place manhole construction. f. Excavation and backfilling of all utility cuts. g. Temporary restoration of all utility cuts