Project 3
Duration: Base + 4 Option Years
Award: $1.5M annually
Scope:
Labor, equipment, tools and material, and the performance of all work necessary for minor pavement patching and crack cleaning and sealing at the locations by DDOT.
The work involves:
Cracks and joints are cleaned of vegetation, debris and loose asphalt.
Sealing material is heated in a machine 380 degrees Fahrenheit for proper placing.
Crack sealant is applied to cracks and squeegeed flat onto the surface.