Project 3
Duration: Base + 4 Option Years
Award: $2.5M annually
Labor, equipment, tools and material, and the performance of all work necessary for saw cut and sealing of newly paved locations provided s by DDOT.
Saw cut, clean and seal transverse and longitudinal joints in new Hot Mix Asphalt (HMA) overlays and shoulders. Construct transverse and longitudinal HMA pavement joints over, and in line with, the existing underlying transverse and longitudinal Portland cement concrete joints contained in the contract documents and as directed by the Engineer.